2 Prefabricated modules (8' X 8' X 8' sculpture, 6' X 6' x5' module) and secondary use concrete (4 pieces) Deployed on 07/10/2023. Total material weight: 21 tons.
Sequence a smart, multi-stop boating itinerary built around this location.